Jump to content

conmgt21

Legacy Members
  • Posts

    3
  • Joined

  • Last visited

Reputation

2 Neutral

Recent Profile Visitors

The recent visitors block is disabled and is not being shown to other users.

  1. That is a hydromill that will excavate the slurry walls. This video explains the process the best:
  2. Based on having 6 levels of garage below ground, I would assume somewhere between 65' and 75' deep.
  3. Its Oscar Orduno installing the temporary soil nail walls. Malcolm Drilling is performing the slurry wall construction and I heard they should start by the end of the month.
×
×
  • Create New...