I will also point out the AFD is drawing an issue with the rezone of the entire parcel of Eightfold, because they want a zoning that allows for an onsite residential component, and the parcel itself obviously abuts to the parcel that contains NXP/Qualcomm fab plant on the north side of the campus. The actual residential component, if there is one on site, would be about ~2500 linear feet away from the fab plan. There are houses currently in existence to the north that are closer to the fab plant.
Whatever the status with that project, it doesn't necessarily take a rezone to get to the desired SF that Amazon is looking for.
3M is currently entitled for another 1.1M SF, they would need to come up with 5.5M more to reach 8M.
Statesman will only have about 1.5-2.0M SF, if they combine with the adjacent parcels there may be some legs there, but that is going to take time and the neighborhoods are going to fight every good thing that will eventually come out of the southside waterfront area.