Jump to content

T’Boo Ted Marshall

Legacy Members
  • Posts

    4974
  • Joined

  • Last visited

Everything posted by T’Boo Ted Marshall

  1. Ha. No. Usually in those situations we are already hungry and adding to the wait makes her extra edgy.
  2. Mine is the complete opposite. Will ask for a menu while we are waiting to be seated.
  3. Sounds like a smart guy.
  4. Used to know some guys at Nabors roofing in Rockwall. Might give them a shout.
  5. Just because you have passed does not mean I have forgotten your egregious error Denkinger.
  6. We haven’t lost confidence in you, but we have.
  7. well had one small polyp that was hyperplastic. No return trips for 10 years.
  8. Cursed! I can only laugh at this point.
  9. Maybe old lady and son should switch vehicles.
  10. The bolded part perfectly encapsulates a woman's POV. Even after nearly 14 years of being married this still grinds my gears.
  11. Begun the Sutab Wars have.
  12. As a SMB owner I agree with this. It sucks for owners because even when the evidence is overwhelmingly in favor of the SMB, AE will often side with the cardholder then hit us with a fee on top of the lost revenue. I no longer accept AE due to their practices.
  13. Do y'all really think MO is on the hot seat?
  14. Good question. No notes on the proposal. Field measurements were provided by another party that did not end up with the project.
  15. These were the details in the proposal. Project Description: Architectural design construction drawings for a rooftop mechanical screen wall system. Preliminary Design Drawings • Design initial plan/elevations and present drawings to client for approval. Construction Drawings Upon approval of preliminary design drawings, architect will develop the following drawings:  RoofPlan  Exterior Elevations  Screen Wall Assembly Details
  16. That was my thought but now it is trying to get his E&O carrier info.
  17. Dealing with an architect on stamped drawings that are wildly inaccurate. This error has caused the need for additional materials on a custom project. Architect has admitted he did not do a site visit to verify measurements that were provided to him. His construction drawings were submitted to a local city as required. He is refusing to accept any responsibility by stating it was not in his scope to verify measurements and that his drawings are accurate. Are there any architects on here that could answer some questions? Thanks.
  18. His midget arms are way too long on that statue.
×
×
  • Create New...