Jump to content

PatSolitanojr

Legacy Members
  • Posts

    580
  • Joined

  • Last visited

Everything posted by PatSolitanojr

  1. "What were you doing off campus, and why were you drinking." -Baylor
  2. Reuben will not be suspended from any games, because we have clear evidence he is guilty, and he does not play for the Cowboys- Roger Goodell
  3. He was a bad apple and I'm glad to see him go.
  4. Maybe we're moving everyone over 75 to the south end zone
  5. No, our D line is the best in the conference. Thank Jesus
  6. I'm just curious as to why someone can't quit thinking about dicks on a football board.
  7. After we start winning next season we'll have loads of cash sitting around
  8. Machinator posted this in the spring football thread a couple days ago. Very exciting. Maybe we'll finally sound like 100,000 2.3 PROJECT DESCRIPTION, SCOPE AND BUDGET: The University of Texas at Austin seeks to build an expansion to the Darrell K Royal – Texas Memorial Stadium to replace the existing South End zone bleachers and existing video display with a new South End Zone, video display, and renovate portions of the adjacent MoncriefNeuhaus Athletic Center. This project is a part of Texas Athletics’ ongoing efforts to expand and upgrade their current facilities to provide the best facilities and services for their student athletes, fans, and staff with a critical eye to the latest in student athlete safety, well-being, and rehabilitation. The scope of this project is proposed to include new exclusive suites, clubs, open air concourses, restroom facilities, new coaches offices, a banquet kitchen, premium, Loge, and student seating, private game-day parking, branding graphics, Longhorn Network areas, Sports Medicine/Nutrition areas, hydrotherapy, and other support spaces. The preliminary Total Project Cost (TPC) for this project is $140,000,000. The TPC includes a Construction Cost Limitation (CCL) for the Construction Manager at Risk of $100,000,000. Fees, furnishings, equipment, other work, miscellaneous expenses, and contingencies make up the balance of the TPC.
  9. I really didn't enjoy game night. It wasn't funny at all to me.
  10. I stopped by my local gun shop to buy the HK P2000 they had and it was sold. Is this a sign to save money? Anyone own one?
  11. Somehow I got my imgur pic to embed
  12. Just finished my G34. Should have spent the money on something reasonable.
  13. Should have committed to Texas instead of aggie. I wonder how many regret that decision. Soso comes to mind.
  14. You're right. He said everything will be evaluated during the spring, including coaches and their duties. Tom called plays in the bowl to see what his offensive staff was dealing with, and I imagine that gave him some sort of idea of what we had been doing wrong and what our identity needs to be moving forward.
  15. https://www.burntorangenation.com/2018/4/10/17220268/texas-longhorns-linebacker-injuries-malcolm-roach-jeffrey-mcculloch-ayodele-adeoye Wescott on the current LB situation.
  16. Yeah Mack is just a smiling face connected with UT football now. It’s a good look for the University to not alienate past coaches. Especially one like Mack.
  17. 2.3 PROJECT DESCRIPTION, SCOPE AND BUDGET: The University of Texas at Austin seeks to build an expansion to the Darrell K Royal – Texas Memorial Stadium to replace the existing South End zone bleachers and existing video display with a new South End Zone, video display, and renovate portions of the adjacent MoncriefNeuhaus Athletic Center. This project is a part of Texas Athletics’ ongoing efforts to expand and upgrade their current facilities to provide the best facilities and services for their student athletes, fans, and staff with a critical eye to the latest in student athlete safety, well-being, and rehabilitation. The scope of this project is proposed to include new exclusive suites, clubs, open air concourses, restroom facilities, new coaches offices, a banquet kitchen, premium, Loge, and student seating, private game-day parking, branding graphics, Longhorn Network areas, Sports Medicine/Nutrition areas, hydrotherapy, and other support spaces. The preliminary Total Project Cost (TPC) for this project is $140,000,000. The TPC includes a Construction Cost Limitation (CCL) for the Construction Manager at Risk of $100,000,000. Fees, furnishings, equipment, other work, miscellaneous expenses, and contingencies make up the balance of the TPC.
  18. Where do we start this thread? Per Machinator: The solicitations for the South End Zone projects have been posted here: https://apps.utsystem.edu/spo/DisplaySPO.aspx
  19. Should I be worried about the lack of Wheeler talk in these reports? Or is that a good thing...
  20. It really is. When you follow the program you see how it was really just one bad hire. Haters will point to the turnover at AD and call us a "cesspool" for it, but they aren't seeing the full narrative.
  21. Having four AD's since 2011 is unbelievable. It explains so much of the internal turmoil. We're extremely lucky to have a guy like CDC. It's starting to feel fully aligned again.
×
×
  • Create New...