Well this is going just lovely. /sarcasm
Floor install started yesterday, and stopped.
Long story, but it’s going to take raising the LR floor to the kitchen height, then leveling compound, and some other crap. Plus the floor wasn’t joining tight in several places, so they took up the 6 boxes already laid and bailed. They’re working on getting some osb to raise the LR floor up to the kitchen (had ceramic tile under the laminate, carpet in LR) and are also switching out the flooring lot.
Of course that issue could be/probably was unleveled floors, but they started in the wrong direction anyway, so I’m going to bite my tongue on that. Worst case is they replace the 6 boxes already used, since they probably weren’t careful taking it up anyway. Either way they’re changing direction and going end to end (across the joists) instead of front to back.
Probably adds another 600-700. 🙄
Projector comes in Thursday, screen on Friday. Cabinet ships on Friday for the second time. First time wires got crossed between seller and manufacturer, and they somehow sent me a Leon center channel instead of a salamander cabinet. Not bueno. Took some leg work, but the company did a great job to solve the problem.
If anyone needs audio stuff, give Audio Advice out of Raleigh a spin, they’re great peeps.
So contractor hell for a bit, and a delay, but they’ll have to deal with it, as do I. Guess there’s going to be an A/V cabinet (still boxed) for them to also move around when they come back.